제품공정도
It’s about
Smarter Packaging &
Sustainable - Eco friendly
Logistics Solutions.
-
10,000,000 Units
Annual Production Volume -
33,058 ㎡
Factory Area
-
STEP 01
Raw material warehousing
Raw Material Input
-
STEP 02
Forming line
Foaming Operation
Upper and Lower Panel Production -
STEP 03
Block forming press
Press Processing
Column Production -
STEP 04
Temporary assembly
Pre-Assembly
Temporary Input and Assembly of Panels and Columns
-
STEP 05
Panel+Block Spot welding
Panel Welding
Welding of Assembled Panels and Columns by Robots -
STEP 06
Panel+Block+Panel Spot welding
Upper and Lower Panel Welding
Welding of Upper and Lower Panels to Welded Panels -
STEP 07
Quality control(QC)
Quality Inspection and Powder Coating
Finished Product Quality Inspection and Shipment